Baseline Cost Estimate (BCE)

Woodye2023-06-08  821

Baseline Cost Estimate (BCE)

A detailed estimate of acquisition and ownership costs normally required for high- level decisions. This estimate is performed early in the program and serves as the base point for all subsequent tracking and auditing purposes.

【友情提示】
(1)请先注册登录后再下载附件。
(2)请使用电脑PC/Mac桌面浏览器下载附件,以获得最佳兼容性。推荐使用Chrome。
(3)如使用手机/平板自带浏览器访问, 请先下载、然后在本机存储中打开文件,附件不支持在线预览、显示或播放。

转载请注明原文地址:https://airmango.net/civil_aviation_words/3090.html
00